Stainless Steel Sewage Pump Selection Method

Nov 20, 2025

Leave a message

1. Assess whether the site conditions meet the usage requirements (voltage, frequency, water quality, power supply capacity, etc.).

2. Select pump specifications

1) Preliminary selection of flow rate: Determine the pump flow rate based on requirements.

2) Determination of pipeline: Calculate the critical settling velocity based on the conveying medium and select the appropriate pipeline diameter.

3) Calculation of pipeline losses: Calculate pipeline losses based on pipeline length and the number of bends and valves.

4) Calculation of pump head: Pump head = Vertical height difference from water surface to outlet + Pipeline losses + Outlet pressure + Safety margin (10%).

5) Determine the pump model based on flow rate and head.

6) Determine the installation method: Fixed or mobile.

Send Inquiry